Wastewater treatment
Singapore Pte. Limited
  • Industrial
    Valves
    Industrial Valves
  • Water
    supply
    Water supply
  • Wastewater
    treatment
    Wastewater treatment
  • Gas
    supply
    Gas supply
  • Other
    segments
    Other segments
Search
Find product
  • News
  • Downloads
  • Cases
  • About AVK
  • Contact
  • AVK Group
  • Wastewater collection
  • Wastewater outlet
  • Wastewater treatment
  • Videos and animations
  • Cases

Cases

  • Choose category
  • All
  • Butterfly valves

Case

Saving water is in our hands every bit helps

Singapore can draw up to 250 million gallons of water a day from the Johor River (1962 Water Agreement), and Singapore is thus required to provide Johor with treated water (up to 2% of the imported water). The 1962 Water Agreement will also expire in 2061. Constructed by PUB supplementary to the 1962 Water Agreement, a 1990 agreement with Johor was written. The Linggiu Reservoir which is located upstream of the Johor River Waterworks, releases water into the Johor River to supplement its flow. This allows for efficient abstraction of raw water at the Johor River Waterworks, owned and operated by PUB for treatment.
Go to the case

Case

Playing our part in preserving the eco-system and enabling water quality in the reservoirs

Population and water consumption estimates are the basis for determining the flow demand of a water supply and distribution system especially in such a small country like Singapore. As demand for water continues to increase in tandem with population and economic growth, we will need to plan and implement water infrastructure well ahead to secure an adequate and affordable supply of water for the future generations.
Go to the case

AVK Singapore Pte. Limited

, 40 Gambas Crescent Nordcom 2
757018 Singapore , Singapore
Telephone: +65 6214 1048
E-mail:
Send e-mail
All contacts Privacy policy Legal notice & disclaimer
Follow us on social media

Telephone

+65 6214 1048